Special offers on all the services*
Mon - Sat: 8:00 AM - 8:00 PM | Sun: 9:00 AM - 5:00 PM
Commercial Building Hitech City, Hyderabad • Completed Aug 20, 2026

Basement Hydrostatic Pressure PU Injection at Hitech City Commercial Tower

Basement Hydrostatic Pressure PU Injection at Hitech City Commercial Tower
!

The Water Ingress Problem

Severe active water ingress through basement retention wall cold joints and elevator pit during heavy monsoon season, risking electrical lift mechanisms.

✓

Engineering Treatment & Execution

Drilled 140 high-pressure packer ports along cold joints and injected hydrophobic polyurethane resin at 250 bar pressure. Active leaks were arrested instantly, followed by a double-coat crystalline barrier slurry across the entire basement slab perimeter.

Before & After Visual Inspection

Before Waterproofing AFTER: REPAIRED BEFORE: LEAKAGE
After Waterproofing
↔

Experiencing a Similar Seepage Challenge?

Get a senior structural engineer to survey your site anywhere in Hyderabad within 24 hours.

Book Home Inspection View More Projects